For Scottish charities and community buildingsCARES may fund up to £80,000 of eligible renewable workCould we qualify?

54 guides to common questions

Find answers before you choose a system.

FLO surveys and installs heat pumps, solar, batteries and air conditioning for Scottish properties. These guides answer the questions to ask before choosing a system; a free survey then checks what works for your own property.

For your own building

Want to know what fits your property?

Every property is different. A free FLO survey checks your building, current energy use and what you want to improve, then helps you see which options are possible.

Request my free survey

54 guides found

Heat pumps01

What does a heat pump cost in Scotland?

Current Scottish cost examples for air-to-air, air-to-water and ground-source heat pumps, plus what can change the final price and funding.

Homeowners
Heat pumps02

Can a heat pump work in an old stone house?

Yes—but the house needs a design that respects its fabric and can heat every room. Here is what to check before deciding.

Owners of older homes
Heat pumps03

Air source vs ground source heat pumps

Compare land, drilling, seasonal performance, capital work and maintenance before choosing a source.

Homes and estates
Heat pumps04

Heat pump radiator sizing without the guesswork

Understand why lower flow temperature changes emitter output and how a room-by-room schedule prevents over- or under-sizing.

Homeowners and designers
Heat pumps05

Flow temperature: the number that shapes heat-pump performance

Why flow temperature affects efficiency, emitter size and comfort—and why it must be a design output.

Technical buyers
Heat pumps06

Heat-pump noise, neighbours and placement

A practical placement guide covering sound data, reflections, access and planning context.

Urban homeowners
Heat pumps07

How to estimate heat-pump running costs honestly

Move from sales claims to a transparent estimate using heat demand, seasonal efficiency, tariff and standing charges.

Homeowners
Heat pumps08

Do you need a new hot-water cylinder with a heat pump?

Cylinder coil size, recovery, space and hot-water patterns explained in plain English.

Homes and small businesses
Heat pumps09

Heat-pump servicing and maintenance: what good looks like

The checks that protect performance, warranties and reliable winter operation.

System owners
Commercial10

Commercial heat-pump feasibility: the evidence to gather first

A pre-feasibility checklist for heat demand, emitters, electrical supply, operating hours and phasing.

Facilities and estates teams
Solar & battery11

Solar panels in Scotland: what determines annual yield?

Orientation, tilt, shade, temperature and system losses matter more than weather stereotypes.

Homes and businesses
Solar & battery12

How to size a solar battery around real demand

Avoid paying for unused capacity by matching generation surplus, evening load and tariff strategy.

Homes and SMEs
Solar & battery13

East-west solar roofs: when a wider generation window wins

Why roof orientation can shape self-consumption and inverter choice—not simply total annual output.

Property owners
Commercial14

Building a commercial solar business case

Turn roof area and bills into a decision model that separates self-consumption, export and avoided cost.

Finance and operations teams
Solar & battery15

Solar export tariffs: what to compare before you sign

Rate, eligibility, meter requirements and contract terms can change the value of surplus electricity.

Homeowners
Solar & battery16

What a proper solar roof survey should cover

Structure, condition, shade, access, fire routes and electrical routing belong in the decision—not after it.

Building owners
Solar & battery17

Solar PV maintenance: a proportionate plan

Monitoring, inspection and targeted cleaning help protect output without unnecessary service visits.

Homes and facilities teams
Planning18

Solar plus heat pump: design the overlap, not the slogan

The two technologies can complement each other, but winter demand and solar output must be modelled honestly.

Homeowners
Solar & battery19

Battery storage without solar: when can it make sense?

Time-of-use charging, peak avoidance and resilience can create a case without rooftop generation.

Tariff-conscious homes
Solar & battery20

Solar grid connection: G98, G99 and why timing matters

A plain-English introduction to network notifications, applications and export limits.

Commercial clients
Air conditioning21

Air conditioning cost: what changes the quote?

Capacity, number of rooms, access, pipe routes, condensate and electrical scope explain most quote variation.

Homes and SMEs
Air conditioning22

Using air conditioning for heating in Scotland

Reversible air-to-air heat pumps can provide fast zoned heat where hot water is handled separately.

Homes and small workplaces
Air conditioning23

Office air conditioning: design around people, glazing and equipment

Floor area alone misses the heat from occupancy, screens, solar gain and meeting-room peaks.

Office managers
Air conditioning24

Server-room cooling: resilience before comfort

Continuous load, redundancy, alarms and condensate risk make technical cooling a different brief.

IT and facilities teams
Air conditioning25

Commercial air-conditioning maintenance and F-gas responsibilities

Keep records, leakage checks and planned maintenance proportionate to the system and refrigerant charge.

Building operators
Air conditioning26

Single split vs multi-split air conditioning

Compare outdoor space, simultaneous demand, pipe routing, resilience and individual room control.

Homes and small businesses
Air conditioning27

Where should an indoor air-conditioning unit go?

Good placement balances airflow, noise, servicing, condensate and the appearance of the room.

Homeowners
CARES funding28

CARES Community Buildings Fund: a plain-English eligibility guide

Check whether your group, its building and the renewable work you have in mind could fit the current CARES rules.

Community organisations
CARES funding29

Your CARES evidence pack: what to gather first

Organise ownership, use, bills, photographs, advice and quotes before missing evidence resets the timetable.

Trustees and project leads
CARES funding30

CARES match funding: planning the 20% share

Map cash, eligible cost boundaries, other fund conditions and board approvals without assuming every contribution qualifies.

Charities and community groups
CARES funding31

Fair procurement for a CARES project

Create a comparable brief, document decisions and separate technical support from the funder's decision.

Community project boards
CARES funding32

Combining heat pumps, solar and battery under CARES

Use the heating requirement and core measures to shape a coherent project, then justify storage against evidence.

Community buildings
CARES funding33

CARES planning for churches and faith buildings

Intermittent occupancy, heritage fabric, high spaces and governance shape both heat design and delivery.

Faith organisations
CARES funding34

Renewable energy planning for village halls

Turn varied bookings, volunteer governance and limited maintenance capacity into a robust energy brief.

Hall committees
CARES funding35

CARES projects for sports clubs and community facilities

Separate changing-room hot water, hall heating, pitches and member access to reveal the true energy profile.

Clubs and trusts
CARES funding36

A realistic CARES project timeline

Sequence eligibility, evidence, design, quotes, permissions, award, installation and claims without assuming funding is guaranteed.

Project leads
Commercial37

Check your business energy use before choosing new equipment

Use your bills and opening hours to see where the money goes and when your building needs the most energy.

Business owners
Commercial38

Is your commercial roof solar-ready?

Structure, remaining roof life, fire strategy, landlord rights, access and grid connection decide readiness.

Property and facilities teams
Commercial39

Landlord, tenant and renewables: align the incentives

Clarify who pays, who saves, who owns equipment and what happens at lease end.

Commercial property stakeholders
Commercial40

Renewable energy for warehouses and industrial units

Large roofs, variable process loads and tall spaces need a different combination of solar, heating and controls.

Industrial occupiers
Commercial41

Hotels and hospitality: coordinate hot water, comfort and solar

Guest comfort, kitchen loads, hot water and occupancy cycles create opportunities—and little tolerance for downtime.

Hospitality operators
Commercial42

A practical office decarbonisation plan

Reduce waste, fix control problems, then coordinate low-carbon heat, cooling and on-site generation.

Owners and occupiers
Planning43

What to expect from a community-building energy survey

Prepare access, bills, drawings and building-use knowledge so a survey produces decisions, not just observations.

Trustees and volunteers
Planning44

Electrical capacity: the hidden constraint in renewable projects

Heat pumps, batteries, solar and EV charging share one connection. Check import, export and distribution before committing.

Multi-technology projects
Planning45

How to phase a multi-technology renewable project

Protect the final system while splitting surveys, enabling works and installations across sensible stages.

Budget-led projects
Planning46

How to compare renewable energy quotes

Use a side-by-side scope that exposes assumptions, exclusions, performance, warranties and evidence.

All buyers
Planning47

MCS certification: what it does—and does not—tell you

Understand certified scope, consumer protections and why current register checks still matter.

Consumers and communities
Planning48

The handover pack every renewable system needs

Settings, drawings, warranties, certificates, monitoring and clear responsibilities make the asset operable.

System owners
Planning49

Your first 12 months of renewable energy data

Track comfort, energy, generation and faults through the seasons without overreacting to one cold week.

New system owners
Planning50

Renewables in listed and traditional buildings

Significance, visibility, moisture, reversibility and permissions should shape the technical options from day one.

Heritage property owners
Heat pumps51

How long does a heat-pump installation take?

Separate survey, design, approvals, enabling work and on-site installation so a short fitting estimate does not hide the full programme.

Homeowners planning the work
Heat pumps52

Heat-pump servicing cost and frequency in Scotland

Understand what changes a service quotation, which checks should be included and why fault diagnosis is different from routine maintenance.

Existing heat-pump owners
Solar & battery53

Solar panel grants in Scotland: what is actually available?

Avoid outdated grant claims by separating solar PV, solar thermal, hybrid systems and the current Home Energy Scotland funding table.

Scottish homeowners
Solar & battery54

Do solar panels need scaffolding?

Safe roof access depends on height, roof form, site space and the installation method; make sure every quote prices the same access plan.

Homeowners comparing solar quotes

Talk to FLO

Just have a question?

Found an answer in a guide but still unsure how it applies to your property? Ask FLO directly; you can request a free survey when you're ready.