Electrical capacity & grid planning

Will your power supply support your plans?

FLO checks your current supply and planned loads before you commit to equipment that may need more electrical capacity.

Every property is different. The free survey checks what is possible before you commit to a system.

Community and commercial property with rooftop solar and outdoor heating equipment

The answer you need

Why can the electricity connection reshape a renewable project?

New loads need import capacity and generation may need export capacity. Internal distribution, protection and network conditions can change sizing, phasing, control or cost.

The property-specific checks

What will FLO check for your property?

We use these details to work out what is practical, what needs more investigation and what the next step should be.

01

Existing demand

Use records and measurement to understand peaks, diversity and power quality where relevant.

02

Future scenario

Model heat pumps, cooling, EVs, process changes, solar and batteries together.

03

Network route

Identify applications, timescales, limits, reinforcement risks and responsible parties.

The next step with FLO

What will your assessment and quote cover?

FLO starts with your property, then explains the recommended work, the price, important exclusions and the next steps in writing.

Useful details to share
Supply size, MPAN and phase arrangementHalf-hourly maximum-demand dataExisting generation or storagePlanned technologies and delivery dates
Request a free commercial energy survey
01

Supply and distribution evidence

02

Future load and generation schedule

03

Network engagement plan

04

Capacity constraints reflected in phasing and controls

Good to know

Questions you may have.

What is the difference between import and export capacity?+

Import supports loads such as heat pumps and charging; export permits surplus generation to flow to the network. Each has a different effect on the project.

Can controls avoid an upgrade?+

Load or export management can sometimes help, but it must be engineered around operational needs and accepted where required.

How early should the DNO be involved?+

As soon as the proposed capacities are credible enough to discuss. Late discovery of a connection limit can force redesign or delay procurement.

What might change the recommendation?+

Desktop estimates cannot guarantee network capacity or avoid a site survey. The network operator makes connection decisions, while the site remains responsible for suitable internal infrastructure.

Original guidance and sources +
SSEN Distribution: Microgeneration connections SSEN Distribution: Connecting a heat pump SP Energy Networks: G99 generator connections

Talk to FLO

Just have a question?

Have a question about electrical capacity & grid planning or your property's suitability? Ask FLO and we'll point you to the right next step.