Server-room cooling

Protect the equipment your business relies on.

FLO checks equipment heat, airflow and what must happen if cooling fails before specifying a system.

Every property is different. The free survey checks what is possible before you commit to a system.

Community and commercial property with rooftop solar and outdoor heating equipment

The answer you need

What should be confirmed before selecting server-room cooling?

Measure or substantiate the IT load, define environmental limits, future growth, operating hours, low-ambient capability, redundancy, alarms, condensate and what happens when a unit fails.

The property-specific checks

What will FLO check for your property?

We use these details to work out what is practical, what needs more investigation and what the next step should be.

01

IT load

Use equipment data or measurement and include credible planned growth.

02

Failure mode

Define redundancy, alarms, remote visibility and emergency response.

03

Environment

Check airflow, dust, humidity, outdoor conditions, condensate and fire interfaces.

The next step with FLO

What will your assessment and quote cover?

FLO starts with your property, then explains the recommended work, the price, important exclusions and the next steps in writing.

Useful details to share
Rack and equipment loadRequired temperature rangeExisting units and alarm historyAcceptable downtime and growth plan
Request a free commercial energy survey
01

Design load and environmental limits

02

Duty/standby or resilience strategy

03

Alarm and monitoring requirements

04

Changeover, commissioning and maintenance plan

Good to know

Questions you may have.

Is one correctly sized unit enough?+

That depends on the consequence of failure and repair time. Critical rooms often need a documented redundancy or contingency strategy.

Why does low outdoor temperature matter?+

The system may need to cool the room even in winter, so equipment and controls must support the expected operating range.

Should the door remain open if cooling fails?+

That is not a universal contingency. The response should be agreed in advance around security, fire strategy, heat release and equipment limits.

What might change the recommendation?+

A unit that can cool an occupied office may not be appropriate for continuous technical duty. Capacity alone does not prove low-ambient operation or acceptable failure risk.

Original guidance and sources +
UK Government: Fluorinated gas guidance for users, producers and traders Scottish Government: Building standards: air-conditioning continuing requirements

Talk to FLO

Just have a question?

Have a question about server-room cooling or your property's suitability? Ask FLO and we'll point you to the right next step.