Commercial heat pumps

Could a heat pump cut the cost of heating your site?

FLO starts with your site's heating demand, working hours and existing equipment before suggesting a heat-pump route.

Every property is different. The free survey checks what is possible before you commit to a system.

Community and commercial property with rooftop solar and outdoor heating equipment

The answer you need

How is a commercial heat-pump project different from a domestic replacement?

The design must represent operating hours, simultaneous loads, ventilation and hot water, distribution temperatures, electrical capacity, resilience and installation phasing while the building remains usable.

The property-specific checks

What will FLO check for your property?

We use these details to work out what is practical, what needs more investigation and what the next step should be.

01

Demand profile

Separate space heating, hot water, process and ventilation loads by time and zone.

02

Distribution

Test existing temperatures, emitters, air systems and plant interfaces against the new duty.

03

Continuity

Plan redundancy, temporary services, phasing, controls and maintenance access.

The next step with FLO

What will your assessment and quote cover?

FLO starts with your property, then explains the recommended work, the price, important exclusions and the next steps in writing.

Useful details to share
Twelve months of fuel and electricity dataOperating hours and critical areasExisting plant and distribution temperaturesCapital timetable and approval process
Request a free commercial energy survey
01

Site energy and operating baseline

02

Heat options and design assumptions

03

Electrical, planning and enabling dependencies

04

Phasing, commissioning and measurement plan

Good to know

Questions you may have.

Can a commercial heat pump use existing emitters?+

Possibly, but output at the proposed temperatures and the hydraulic arrangement must be checked across real operating conditions.

Is bivalent heating always a compromise?+

Not necessarily. A documented hybrid strategy can address peak demand or resilience, but its control and carbon logic must be explicit.

What data should we provide first?+

Fuel and electricity data, operating hours, plant records, drawings, comfort issues and planned site changes create the most useful starting point.

What might change the recommendation?+

A product quote is not a decarbonisation plan. Investment decisions need energy evidence, operational agreement and clarity about enabling work, tariffs and network constraints.

Original guidance and sources +
Energy Saving Trust: Heat pumps: everything you need to know SSEN Distribution: Connecting a heat pump Scottish Government: Building standards technical handbook: non-domestic, April 2026 Business Energy Scotland: SME Loan Scheme frequently asked questions

Talk to FLO

Just have a question?

Have a question about commercial heat pumps or your property's suitability? Ask FLO and we'll point you to the right next step.